Rotec Security

Case Studies

Rotec have supplied a range of high-quality steel door packages on numerous prestigious projects in collaboration with Architects and Tier 1 Contractors, throughout the UK.

Plumstead Phase 2 – 76 Steel Doors Supplied & Installed

Clapham Park Estate Phase 2 – 94 Doors & Louvres Supplied & Installed

Beam Park Phase 2 – 70 Steel Doors Supplied

St Pancras Commercial Centre – 110 Steel Doors Supplied

Angel Square – 70 Steel Doors Supplied and Installed

Cambridge Road – 35 Steel Doors Supplied and Installed

Alma Phase 2A + 4 – 52 Steel Doors Supplied & Installed

Horsham Training Centre and Fire Station – 70 Steel Doors Supplied

Unity Place – 44 Steel Doors Supplied

HMP Glen Parva – 101 Steel Doors & 33 Roller Shutters Supplied

McArthur Glen Outlet – 86 Steel Doors Supplied

Cardiff HMRC HQ – 39 Steel Doors Supplied

Pull Handles

Key FEATURES

Finish: Satin Stainless Steel Grade 304

 

  • 300mm centres on concealed 10mm rose
  • Suitable for 35-54mm door thickness
  • Inner rose supplied with 4 point fixing

 

Dimensions: 19mm diameter inline pull handles