Rotec Security

Case Studies

Rotec have supplied a range of high-quality steel door packages on numerous prestigious projects in collaboration with Architects and Tier 1 Contractors, throughout the UK.

Plumstead Phase 2 – 76 Steel Doors Supplied & Installed

Clapham Park Estate Phase 2 – 94 Doors & Louvres Supplied & Installed

Beam Park Phase 2 – 70 Steel Doors Supplied

Cambridge Road – 35 Steel Doors Supplied and Installed

Alma Phase 2A + 4 – 52 Steel Doors Supplied & Installed

One Nine Elms – 172 Steel Doors Supplied

Equipment Works – 20 Steel Doors Supplied

Millbrook Park – 51 Steel Doors Supplied

Vimto Gardens – 32 Steel Doors Supplied

Gallions Quarter – 45 Steel Doors Supplied

Kidbrooke Park (Block A-D) – 37 Steel Doors Supplied

Pull Handles

Key FEATURES

Finish: Satin Stainless Steel Grade 304

 

  • 300mm centres on concealed 10mm rose
  • Suitable for 35-54mm door thickness
  • Inner rose supplied with 4 point fixing

 

Dimensions: 19mm diameter inline pull handles